Mingachevir Power Substation

A 110/35 kV substation upgrade increasing regional grid capacity and reliability.

PROJECT NO.05 / 08
STATUSOngoing
COORDINATES40.7699° N · 47.0492° E

05Mingachevir

LOCATION
Mingachevir, Azerbaijan
SECTOR
Energy
CLIENT
Azerenerji OJSC
TIMELINE
2023–2025

01PROJECT OVERVIEW

Mingachevir Power Substation

The scope covers upgraded switchgear, transformers and control systems at the Mingachevir substation. Works are coordinated with the national grid operator to raise regional capacity without interrupting supply.

IN NUMBERS

Duration, months
30
Key milestones
4
Disciplines
3
Project Handover
Q4 2025

02THE CHALLENGE

Upgrade works had to proceed without interrupting live grid supply to surrounding districts, constraining sequencing and outage windows.

03THE SOLUTION

Empire Construct scheduled works around approved outage windows and used temporary bypass configurations to maintain supply throughout the upgrade.

04SCOPE OF WORK

What the work involved.

  1. 01

    Structural Works

    Foundations and structural upgrades for new transformer bays.

  2. 02

    Electrical & MEP

    Switchgear, transformer and control system installation.

  3. 03

    Infrastructure

    Site access, cabling corridors and perimeter security works.

05PROJECT TIMELINE

From planning to handover.

  1. Q2 2023

    Planning & Design

  2. Q4 2023

    Construction Start

  3. Q3 2024

    Milestone Completion

  4. Q4 2025

    Project Handover