Energy
Mingachevir Power Substation
A 110/35 kV substation upgrade increasing regional grid capacity and reliability.
05Mingachevir
- LOCATION
- Mingachevir, Azerbaijan
- SECTOR
- Energy
- CLIENT
- Azerenerji OJSC
- TIMELINE
- 2023–2025
01PROJECT OVERVIEW
Mingachevir Power Substation
The scope covers upgraded switchgear, transformers and control systems at the Mingachevir substation. Works are coordinated with the national grid operator to raise regional capacity without interrupting supply.
IN NUMBERS
- Duration, months
- 30
- Key milestones
- 4
- Disciplines
- 3
- Project Handover
- Q4 2025
02THE CHALLENGE
Upgrade works had to proceed without interrupting live grid supply to surrounding districts, constraining sequencing and outage windows.
03THE SOLUTION
Empire Construct scheduled works around approved outage windows and used temporary bypass configurations to maintain supply throughout the upgrade.
04SCOPE OF WORK
What the work involved.
- 01
Structural Works
Foundations and structural upgrades for new transformer bays.
- 02
Electrical & MEP
Switchgear, transformer and control system installation.
- 03
Infrastructure
Site access, cabling corridors and perimeter security works.
05PROJECT TIMELINE
From planning to handover.
Q2 2023
Planning & Design
Q4 2023
Construction Start
Q3 2024
Milestone Completion
Q4 2025
Project Handover