Industrial
Lankaran Agro-Logistics Terminal
A cold-storage and sorting terminal to speed up export of the region's subtropical produce.
08Lankaran
- LOCATION
- Lankaran, Azerbaijan
- SECTOR
- Industrial
- CLIENT
- South Agrarian Holding
- TIMELINE
- 2025–2027
01PROJECT OVERVIEW
Lankaran Agro-Logistics Terminal
The project covers cold-storage warehouse blocks, a sorting and packaging line, and loading ramps, designed to meet the requirements of an export-oriented supply chain.
IN NUMBERS
- Duration, months
- 27
- Key milestones
- 4
- Disciplines
- 3
- Project Handover
- Q2 2027
02THE CHALLENGE
The site sits in a high-humidity coastal zone, requiring extra moisture protection for the structural foundations.
03THE SOLUTION
Empire Construct applied an extended drainage layer and a moisture-resistant foundation solution to ensure long-term structural stability.
04SCOPE OF WORK
What the work involved.
- 01
Structural Works
Prefabricated cold-storage structure on a moisture-resistant foundation.
- 02
Electrical & MEP
High-capacity electrical supply for refrigeration systems.
- 03
Infrastructure
Loading ramps and an internal road network for heavy transport.
05PROJECT TIMELINE
From planning to handover.
Q1 2025
Planning & Design
Q3 2025
Construction Start
Q4 2026
Milestone Completion
Q2 2027
Project Handover
06GALLERY







